Hero image

Best decking experts in Mosman

Post a job now to get quotes from local decking experts

    Product Review
    Star

    Top Mosman decking experts near you

    Browse top Decking Expert experts with top ratings and reviews

    4.9
    Average rating of decking experts in Mosman based on 580 reviews of 43 businesses.

    View more decking experts

    Popular decking jobs in Mosman

    • Decking job

      Posted by Peta

      09 Apr 2026
      • Mobile Verified
        VerifiedInformationPhone number has been verified
      • Mobile VerifiedMobile
        Phone number has been verified
      Location: Mosman, NSW
      Job Description: Terracotta tiles in need of replacing but had hoped I could deck o re the top
      Decking service needed: Repair existing deck | Type of decking material: Tiles ..was hoping to b able to deck over top | Approximate square meters of deck: More than 75 sqm | When: As soon as possible
    • Decking job

      Posted by Keith

      04 Jul 2024
      • Mobile Verified
        VerifiedInformationPhone number has been verified
      • Mobile VerifiedMobile
        Phone number has been verified
      Location: Mosman, NSW
      Job Description: A small piece of an old but sound deck has rotted and broken away. Would like deck checked and repaired please.
      Decking service needed: Repair existing deck | Type of decking material: Pine | Approximate square meters of deck: Under 25 sqm | When: Any time that works
    • Decking job

      Posted by Martin

      13 Jun 2024
      • Mobile Verified
        VerifiedInformationPhone number has been verified
      • Mobile VerifiedMobile
        Phone number has been verified
      Location: Mosman, NSW
      Job Description: Scope of Works: Deck and Stair Renovation Project Overview: The project involves the renovation and installation of a deck and stairs, including the replacement of existing structures, painting, and the installation of new decking materials using Marmox Sloping Boards and Enduradeck Driftwood decking boards and fascia. Special attention will be given to ensuring proper water drainage through board orientation and fascia installation. The existing deck dimensions are approximately 3.85 meters x 1.1 meters with 11 standard stair treads. Detailed Scope of Works: 1. Preparation and Planning: * Safety Measures: * Ensure all workers wear protective gear, including gloves, safety glasses, and stable scaffolding or ladders. * Confirm all necessary local permits and regulations are checked and obtained. * Environmental Considerations: * Plan for the responsible disposal of removed materials, recycling where possible. * Cost Estimation: * Prepare a rough cost estimation for materials and labor to aid in budgeting. * Weather Contingencies: * Plan for adverse weather conditions, including covering materials and rescheduling outdoor work if necessary. 2. Site Measurements: * Deck Dimensions: * Confirm the existing deck dimensions of 3.85 meters x 1.1 meters. * Stair Treads: * Confirm the dimensions of 11 standard stair treads (0.78 meters x 0.24 meters each). * Perspex Panels: * Measure existing Perspex panels to determine if replacements or additional materials are needed. 3. Remove Existing Structures: * Balustrade Panels and Beading: * Carefully remove existing balustrade panels and beading to prepare for new installations. * Inspect Perspex panels and beading for damage and plan for cleaning or replacement as necessary. * Decking Boards: * Remove the existing decking boards to expose the underlying joists. 4. Inspect and Replace Joists: * Identify Rotten Joists: * Inspect the existing joists for any signs of rot or damage. * Replace/Add Joists: * Remove the rotten joists and replace them with pre-primed and pre-painted joists. * Ensure joists are installed with a spacing of 400mm or better for optimal support and stability. 5. Prepare and Paint Balustrades, Handrails, Beading, and Stair Stringers: * Preparation: * Sand and clean the balustrades, handrails, beading, and stair stringers to ensure a smooth surface for painting. * Painting: * Apply exterior water-based paint in Monument colour to the balustrades, handrails, beading, and stair stringers. * Allow the paint to dry completely before proceeding with further installations. Ensure drying time is specified based on paint manufacturer instructions (typically 24-48 hours). 6. Install Marmox Sloping Boards: * Prepare the Surface: * Ensure the joist surface is clean, dry, and level before applying the Marmox Sloping Boards. * Apply Marmox Sloping Boards: * Install the Marmox Sloping Boards, ensuring they slope away from the house to facilitate proper water drainage. * For stair treads, ensure the boards slope downwards to prevent water accumulation and enhance safety. * Use a level to verify all slopes are correct. * Secure the boards with appropriate adhesives or screws as per manufacturer guidelines. * Seal all joints with waterproof sealant. 7. Install Enduradeck Driftwood Decking Boards and Fascia: * Decking Boards: * Acclimate the decking boards to the site conditions for at least 48 hours. * Lay the Enduradeck Driftwood decking boards over the Marmox Sloping Boards, ensuring the gaps between the boards slope downhill to facilitate water drainage. * Use hidden fasteners to secure the boards, providing a clean and polished finish. * Ensure each board is properly aligned and spaced. * Fascia Installation: * Cut fascia boards to size and secure them to the edges of the decking. * Apply a fascia with a packer so that the water can drop below the edge. * Use colour-matched screws or nails for a seamless appearance. 8. Clean or Replace Perspex Panels and Install/Reinstall Beading: * Cleaning: * Clean Perspex panels with a suitable cleaner to remove any dirt and debris. * Replacement: * Replace any damaged Perspex panels with new ones. * Beading: * Install or reinstall the pre-painted beading, ensuring a secure fit around the panels. 9. Repair Front Gate: * Reinforce Frame Joints: * Use countersunk screws to reinforce the four frame joints of the front gate due to rusty nails. * Filling Holes: * Fill the countersunk holes to ensure a smooth surface. * Repainting: * Prepare and repaint the gate, excluding posts. 10. Final Adjustments and Finishing: * Ensure All Slopes Are Correct: * Double-check that all Marmox Sloping Boards are properly sloped to ensure effective drainage. * Final Inspection: * Conduct a final inspection to ensure all components are securely and correctly installed.
      Decking service needed: Repair existing deck | Type of decking material: Composite | Approximate square meters of deck: Under 25 sqm | When: As soon as possible

    Get the right price for your job

    The Oneflare Cost Guide Centre is your one-stop shop to help you set your budget; from smaller tasks to larger projects.

    Browse decking experts by suburb

    View suburb directory

    Popular searches on Oneflare