Hero image

Best bathroom renovators near you

Post a job now to get quotes from local bathroom renovators

    Product Review
    Star

    Top bathroom renovators near you

    Browse top Bathroom Renovator experts with top ratings and reviews

    4.8
    Average rating of bathroom renovators based on 852 reviews of 46 businesses.

    View more bathroom renovation experts

    Popular bathroom renovation jobs

    • Draftsman job
      LIVE JOB
      Quotes received (0/3)

      Posted by Samuel

      23 Mar 2026
      • Mobile Verified
        VerifiedInformationPhone number has been verified
      • Mobile VerifiedMobile
        Phone number has been verified
      Location: Hallett Cove, SA
      Job Description: Looking for a professional draftsman to design an elevated deck + pergola that I can put forward for council approval before it is built.
      Kind of job: Deck | Council approval: No | Stage of process: Planning stage | Size of project: ~20 | Commercial or residential: Residential | Type of residence: Freestanding house | When: As soon as possible
      Quotes received (0/3)
    • Bathroom Renovations job
      LIVE JOB
      Quotes received (3/3)

      Posted by Dylan

      23 Mar 2026
      • Mobile Verified
        VerifiedInformationPhone number has been verified
      • Mobile VerifiedMobile
        Phone number has been verified
      Location: Werribee, VIC
      Job Description: new shower
      Services needed: Replace fixtures (toilet, taps, shower/bath) | Stage of process: Ready to hire | When: As soon as possible
      Quotes received (3/3)
    • Bathroom Renovations job
      LIVE JOB
      Quotes received (1/3)

      Posted by Patrick

      23 Mar 2026
      • Mobile Verified
        VerifiedInformationPhone number has been verified
      • Mobile VerifiedMobile
        Phone number has been verified
      Location: Lamb Island, QLD
      Job Description: Shower rebuild and new vanity due to cracked shower tiles. Entire ensuite is only 2.65mx1.17m it's not a large space, with the shower taking up 0.9mx1.17m. Open to idea of full renovation, but need those two things. I like my current toilet and fittings, but the tiles are out dated
      Services needed: Fix water damage or plumbing issues | Stage of process: Ready to hire | When: Any time that works
      Quotes received (1/3)
    • Draftsman job
      LIVE JOB
      Quotes received (4/3)

      Posted by Rocky

      22 Mar 2026
      • Mobile Verified
        VerifiedInformationPhone number has been verified
      • Mobile VerifiedMobile
        Phone number has been verified
      Location: Killara, NSW
      Job Description: As Built Drawings
      Kind of job: New build | Council approval: Not needed | Stage of process: Planning stage | Size of project: 182 sqm | Commercial or residential: Residential | Type of residence: Freestanding house | When: As soon as possible
      Quotes received (4/3)
    • Bathroom Renovations job
      LIVE JOB
      Quotes received (0/3)

      Posted by Paul

      20 Mar 2026
      • Mobile Verified
        VerifiedInformationPhone number has been verified
      • Mobile VerifiedMobile
        Phone number has been verified
      Location: Scarborough, WA
      Job Description: move toilet to increase size of the shower, change single vanity to double vanity
      Services needed: Replace fixtures (toilet, taps, shower/bath) | Stage of process: Ready to hire | When: As soon as possible
      Quotes received (0/3)
    • Bathroom Renovations job
      LIVE JOB
      Quotes received (1/3)

      Posted by Oliver

      20 Mar 2026
      • Mobile Verified
        VerifiedInformationPhone number has been verified
      • Mobile VerifiedMobile
        Phone number has been verified
      Location: South Perth, WA
      Job Description: Full renovation of a 3m x 2m bathroom & Separate WC including demolition, removal of waste, procurement of fixtures, tiles, fittings consumables, waterproof & installation. Should not require any fixtures moving from existing locations.
      Services needed: Complete renovation or extension | Stage of process: Planning phases | Approval for works: Not needed | When: Any time that works
      Quotes received (1/3)